# BUG: RobotStudio 5.13 RAPID Synchronization Dialog

**URL:** <https://tech-community.robotics.abb.com/t/bug-robotstudio-5-13-rapid-synchronization-dialog/3540>\
**Category:** RobotStudio\
**Created:** [April 26, 2010, 11:32pm UTC](https://tech-community.robotics.abb.com/t/bug-robotstudio-5-13-rapid-synchronization-dialog/3540 "2010-04-26T23:32:41Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Henrik\_Berlin](https://dub1.discourse-cdn.com/flex005/user_avatar/tech-community.robotics.abb.com/henrik_berlin/32/1011_2.png) [@Henrik\_Berlin](https://tech-community.robotics.abb.com/u/Henrik_Berlin)\
**Post date:** [April 26, 2010, 11:32pm UTC](https://tech-community.robotics.abb.com/t/bug-robotstudio-5-13-rapid-synchronization-dialog/3540/1 "2010-04-26T23:32:41Z")

</div>

**Background:** The user interface for RAPID Synchronization between a RobotStudio station and a Virtual Controller has been remade to support synchronization of single data, which is a new feature of RS 5.13. The new design also supports sorting of paths. Unfortunately, two small bugs have entered the code without being discovered in time to be fixed for the 5.13 release. The problems will be fixed in RobotStudio 5.13.01 that will be available around the end of Q2 2010.

**--------------------------------------------------------------------------------------------**  
**Problem 1: Synchronize to VC may fail even though reported as success**

**Symptom:** The problem may appear on controller systems that contain RAPID procedures that take arguments, see the example **draw\_square** below that takes the argument named **side\_size** of type **num**.

PROC draw\_square(num side\_size)

! …

ENDPROC

These kind of procedures now erroneously appear in the dialog **Synchronize to Station** and can be selected for synchronization to the RobotStudio station. In the next step when synchronizing back to the Virtual Controller, these procedures cause the command **Synchronize to VC** to fail silently, even though the message _?\_~Synchronization to VC completed?\_T_ appears in the Output window.

**Workaround:** Delete the procedures and redo the **Synchronize to VC** command.

**--------------------------------------------------------------------------------------------** \*\*Problem 2: Single data not synchronized when task is checked in Synchronize to VC\*\*

**Symptom:** When selecting an entire task in the **Synchronize to VC** dialog, only the paths (including referenced data) will be synchronized, not single data that are **not** referenced by a path, even though checked for synchronization.

**Workaround:** Select the single data **only** for synchronization.

* * *

We apologize for any inconvenience these problems may cause.

---

<div class="post-metadata">

**Author:** ![Henrik\_Berlin](https://dub1.discourse-cdn.com/flex005/user_avatar/tech-community.robotics.abb.com/henrik_berlin/32/1011_2.png) [@Henrik\_Berlin](https://tech-community.robotics.abb.com/u/Henrik_Berlin)\
**Post date:** [April 29, 2010, 10:44pm UTC](https://tech-community.robotics.abb.com/t/bug-robotstudio-5-13-rapid-synchronization-dialog/3540/2 "2010-04-29T22:44:31Z")

</div>

This problem is fixed in RobotStudio 5.13 with Patch 1, see [http://forums.robotstudio.com/forum\_posts.asp?TID=4009](http://forums.robotstudio.com/forum_posts.asp?TID=4009).
