# Palletizer Powerpac Flow Recovery

**URL:** <https://tech-community.robotics.abb.com/t/palletizer-powerpac-flow-recovery/11098>\
**Category:** PowerPacs\
**Created:** [April 20, 2023, 11:59am UTC](https://tech-community.robotics.abb.com/t/palletizer-powerpac-flow-recovery/11098 "2023-04-20T11:59:33Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![KyHyd](https://avatars.discourse-cdn.com/v4/letter/k/7bcc69/32.png) [@KyHyd](https://tech-community.robotics.abb.com/u/KyHyd)\
**Post date:** [April 20, 2023, 11:59am UTC](https://tech-community.robotics.abb.com/t/palletizer-powerpac-flow-recovery/11098/1 "2023-04-20T11:59:33Z")

</div>

I’m using the palletizer Powerpac option with one project and one flow.

The projects starting/stopping and the flow start/stop/recovery is being controlled by the PLC.

The customer wants to hide the pendant away from the operators and have all control on the HMI. The problem is when I stop the slow using stop option “Stop Immediately” and then try to recover the flow to restart a layer I get a UIMessageBox on the teach pendant that asks you to verify the cause of the stop is removed and then press ok to confirm.

Is there a way of recovering the flow from a error state without having confirm on the teach pendant ?

---

<div class="post-metadata">

**Author:** ![nicolahinssen](https://avatars.discourse-cdn.com/v4/letter/n/e47774/32.png) [@nicolahinssen](https://tech-community.robotics.abb.com/u/nicolahinssen)\
**Post date:** [April 20, 2023, 5:03pm UTC](https://tech-community.robotics.abb.com/t/palletizer-powerpac-flow-recovery/11098/2 "2023-04-20T17:03:02Z")

</div>

If the HMI is using the PC SDK, you can follow these instructions:

> **[Enable operator response to RAPID UI-instructions from a PC](https://developercenter.robotstudio.com/api/pcsdk/articles/Manual/Using-the-PC-SDK/Rapid-domain/Enable-operator-response-to-RAPID-UI-instructions-from-a-PC.html)**
