# Simulation with ABB Dresspack Cable

**URL:** <https://tech-community.robotics.abb.com/t/simulation-with-abb-dresspack-cable/1226>\
**Category:** RobotStudio\
**Created:** [May 21, 2007, 1:57pm UTC](https://tech-community.robotics.abb.com/t/simulation-with-abb-dresspack-cable/1226 "2007-05-21T13:57:15Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![chandra\_bipin](https://avatars.discourse-cdn.com/v4/letter/c/8e7dd6/32.png) [@chandra\_bipin](https://tech-community.robotics.abb.com/u/chandra_bipin)\
**Post date:** [May 21, 2007, 1:57pm UTC](https://tech-community.robotics.abb.com/t/simulation-with-abb-dresspack-cable/1226/1 "2007-05-21T13:57:15Z")

</div>

Dear ABB Team,

In Robotstudio 5.08, can i simulate the stations with IRB6600 family robots dressed with spotwelding cable harness ( Orange line /Silver Line) ? especally the upper arm.

As u know spotwelding cable management is very critical in most of GEO stations. Kindly advise

Regards

Bipin
