Is there any possibility to do a variable synch separation according to the project that we want to run ? Sometimes I need a synch separation of 15mm another time 25mm. We have solved this problem by programing some function in the PLC but I want to know if there is any other possibility to do it with PM.
Hi, you can use rapid code to write the sync seperation value in the qtrack values in the eio.cfg file and then use a rapid command to re-start the controller.
I have used this method before but not with Pickmaster so I do not know what effect this would have on the Pickmaster system, but it is possible with rapid.