Is it possible to sync targets to the virtual controller without adding them to a path? This seems to be the only way to get them into the VC.
I have everything ‘ticked’ for synchronisation!
Cheers,
Paul.
Is it possible to sync targets to the virtual controller without adding them to a path? This seems to be the only way to get them into the VC.
I have everything ‘ticked’ for synchronisation!
Cheers,
Paul.