Hi,
I have a pickmaster using 2 different lines. The differencies between this 2 line is only some camera settings.
To open a project we are using RIS functionnality.
When project 1 using line A is running and we sent a RIS command to open project 2 using line B, the running project closed without message but the robots are still running. Normally when you try to close a running project pickmaster tell us that it is not possible. I have also tried manually to open project 2 from line B when project 1 was running and the same think happend.
Is this normal ?
BR,
Fabrice