I’ve been working on the same virtual solution for a year, since RS6.01 and, once I have installed the RS6.04, the RobotController crashes as soon as I open the solution and it tries to connect to the robot controller. There it is the fault log.
I have 2 IRB4600 on the same solution with a quite big 3D model. The whole solution size is 320mb.
I have fixed this through my local ABB, initializating the controller and doing an I-Start.
Anyway, after few days of solving this, during the work on this station, a robotstudio Force Close happened, and it has corrupt the whole station! I cannot even open it.