Synchronize To Station Issue

I’m having a strange problem with RobotStudio 5.61.02. (I had the same issue with 5.61.01). I make changes to my RAPID code and apply, then try to synchronize to station. The dialog pops up, but only the virtual controller icon is visible. I wait several minutes, but the tree is not populated. If I save and close the station, reopen it, then sync to station again once the VC starts up, the tree appears and I can sync with no problems. Synchronize to VC works with no issues.

I have tried this with three different stations, all with different VCs.

Has anyone else encountered this problem?

Thanks,
Scott

An update: I discovered today that if, after making a RAPID change, I close the RAPID module after applying changes, the synchronize to station operation works just fine. That’s a workaround I can live with, so I’m marking this resolved.