Hello,
We have an installation where two IRB 340 (Multi-Move) are working in line on two conveyors.
The Robots should pack 4 items in a container. It is important that the items are placed strict, due to the layer.The first robot should place item 1 and 2 (layer1) and the second robot should place 3 and 4 (layer2) on top of item 1 and 2.
If we use ATC this is working OK. Sometimes 3 items are placed in the right order.
If we use Load Balancing we have the following problem. Robot 1 places item 1 and 3 and Robot 2 is placing 2 and 4. This is NOT OK, because we have to place layer 1 at first due to the gripper Design.
We tried several methods (changing patterns, switching layers, etc.) and nothing helped.
Do you have any idea to solve that issue.
Stefan