Hi,
I wonder if it’s possible to modify PM5 project via backup:
- Get a current backup from the controller
- Retrieve PM5 project from the backup
- Modify PM5 project in PickMaster program
- Replace the PM5 project in the backup
- Restore backup in the controller
The reason I’m asking is that I am trying to save travel time to customer. If the customer can give the latest backup so I can modify it at the office and they restore the backup that already has the modified PM5 project, that would be brilliant!
Thanks for all the answers.